Seaway Heavy Lifting’s vessel, Stanislav Yudin, has successfully completed a record run of foundation installation works at Gwynt y Môr Offshore Wind Farm. The vessel, operating over eight miles off the North Wales coast, installed 80 monopiles and 32 transition pieces in 77 days, ensuring all 160 wind turbine locations have a foundation in place.

Back to top